Automated drawing review against building codes.
A city construction authority.
2 days → 2 hoursReview time per drawing set
- 100%Of submissions checked against the full rule set
- On siteFully offline, inside the authority’s network
- Customer
- A city construction authority
- Industry
- Government & public sector
- Deployment
- On site, offline
- Workflow
- Review against rules
BEFORE MATRIX
The challenge.
Every construction drawing had to be checked against building codes and reference standards by a small team of specialists.
THE WORKFLOWWhat we built,
What we built,
step by step.
A knowledge base of regulations and reference drawings, turned into review rules. Matrix reads CAD drawings, checks them against the rules and lists each issue with the clause cited. The same system supports scoring in public tenders.
- 01Structured 172 building standards and 33,000+ clauses into a rule library.
- 02Turned clauses into checkable rules, each with its source and version.
- 03Matrix reads the project, identifies the drawings, gathers the evidence, runs exact calculations, applies the rules and scores each one.
- 04An expert reviews the findings and signs off.
UNDER THE HOOD
How it works.
A-201 Level 1 plan.pdf3 ISSUES
Office 101Office 102Meeting 103CorridorLobbyWCStore1234ABCN40 in38 in
123
PROJECTExample office buildingDRAWINGLevel 1 planSCALE1:100SHEETA-201
- 1Stair narrower than requiredDrawn 40 in, needs 44 inClause 6.2.3
- 2Door swings into the corridorOpens across the way outClause 4.1.7
- 3Column narrows the corridor38 in clear, needs 44 inClause 6.4.1
Let’s make AI useful.
For your actual work.
Tell us about a job your team repeats, not your confidential files. We’ll show you how Matrix handles work like it.
Request a demo